Broadband networks

American Systems

Execution of construction and executive designs
Construction of cable, broadband distribution networks
Construction of subscriber connections
Supply of active devices
As-built survey

In 2013, the Management Board of American Systems decided to build competence in the area of broadband network construction. Currently, the company performs comprehensive work in this area, which includes:

  • preparation of construction and executive designs of the distribution and access network,
  • construction of cable ducts,
  • construction and commissioning of cable broadband distribution networks, including access networks in the FTTH technology, together with indirect access points for broadband Internet;
  • construction of subscriber connections;
  • supply of active devices;

American Systems since 2014 has participated in all infrastructure projects both nationwide and for the Wielkopolskie Voivodeship. Our experience includes the implementation of the following projects:

  1. Project no. POIG.08.04.00-30-066/09 – for Strzałkowo “Providing Broadband Internet in Towns of Central and Eastern Wielkopolska Region” (INEA S.A.)
  1. Project no. POIG.08.04.00-30-035/10 – for Glinno “Providing Broadband Internet in 2 Towns in Nowy Tomyśl County” (INEA S.A.)

  2. Project no. POIG.08.04.00-30- 102/11 – for Golina Wielka, Glińsko, Zaborówiec, Jezierzyce Kościelne, Garzyn, Białężyn, Kalwy, Kozłowo, Skiereszewo, Zbrudzewo “Providing Broadband Internet in Selected Towns of the Wielkopolskie Voivodeship” (INEA S.A.)

  3. Project no. POIG.08.04.00-30- 102/11 for Śródka, Koninek, Kamionna, Szczodrzykowo, Zdrój, Osieczna, Stare Bojanowo, Biernatki, Sierosław, Kaszczor, Stary Bukowiec) “Providing Broadband Internet in Selected Towns of Wielkopolskie Voivodeship” (INEA S.A.)
In 2015, tasks from the operational programme “2.8 Providing Access to Broadband Internet” were implemented in Leszczyński, Rawicki, Gostyński and Kościański Counties, consisting in the construction of the FTTH (fiber to the home) network with a total value of PLN 49,639,000.00 net. (say: forty nine million six hundred thirty nine thousand zlotys net). The task consisted in the implementation of construction and executive projects, building an FTTH network, including the delivery of materials, and the preparation of as-built documentation. The scope of the investment included the construction of a network to 15320 households with a total length of 503 km and was completed within 10 months from March to December 2015.
  1. Measure 2.8 WRPO Project no. WND-RPWP.02.08.00- 30-013/13 ,, Providing Broadband Internet in Kościański County” (Webtouch Spółka z ograniczoną odpowiedzialnością Spółka Komandytowo Akcyjna)
  2. Measure 2.8 WRPO Project no. WND-RPWP.02.08.00- 30-140/13 ,, Providing Broadband Internet in Rawicki County” (Fibrehost Spółka z ograniczoną odpowiedzialnością Spółka Komandytowo Akcyjna)
  3. Measure 2.8 WRPO Project no. WND-RPWP.02.08.00- 30-034/13 ,, Providing Broadband Internet in Gostyński County” (Fibrehost Spółka z ograniczoną odpowiedzialnością Spółka Komandytowo Akcyjna)
  4. Measure 2.8 WRPO Project no. WND-RPWP.02.08.00- 30-042/13 ,, Providing Broadband Internet in Gostyński County” (Webtouch Spółka z ograniczoną odpowiedzialnością Spółka Komandytowo Akcyjna)
The company prides itself on completing all projects in the field of fiber optic network construction within the time limit and specified budget. In addition, American Systems has never been called on by any customer to remove any defect or fault in projects implemented by American Systems.

In 2016, American Systems Sp. z o.o. has prepared and submitted 2 applications under the Operational Programme Digital Poland, Priority Axis 1 Universal Access to High-Speed Internet, Measure 1.1 Eliminating Territorial Differences in Terms of Access to High-Speed Broadband Internet.   Two applications for investment areas POPC404 and POPC 406 were accepted and granted funding from CPPC.  Therefore, in the years 2016-2018, American Systems is implementing two of its telecommunications projects:

  1. Project “Eliminating Territorial Differences in Terms of Access to High-Speed Broadband Internet in Wrocław County POPC01_020406” The project involves the construction of a broadband Internet network with a total length of 57.31 km in Wrocław County (POPC01_020406). As a result of the implementation of the project, 1483 households and 3 public entities will gain access to the Internet with parameters not less than 30 Mb/s. As part of the project, it is planned to design and build a broadband Internet network in the Wrocław County, resulting in maximising the coverage of the country with modern Next Generation Access Networks.

    Project value: PLN 7,577,988.75
  2. Project “Eliminating Territorial Differences in Terms of Access to  4 of 91 High-Speed Broadband Internet in  Wrocław County POPC01_020404″. The project involves the construction of a broadband Internet network with a total length of 45.19 km in Wrocław County (POPC01_020404). As a result of the implementation of the project, 1013 households will gain access to the Internet with parameters at least 100 Mb/s. As part of the project, it is planned to design and build a broadband Internet network in the Wrocław County, resulting in maximising the coverage of the country with modern Next Generation Access Networks.

    Project value: PLN 5,586,123.19
The infrastructure that will eventually be built as part of the above projects will allow end users to access virtually all modern multimedia and telecommunications services on the market, i.e.
  • digital TV in HD resolution (1080p, 720p, 1080i),
  • broadband Internet access (at least 30 Mb/s per user),
  • fixed telephony,
  • advanced VOD (Video On Demand) services, the Infrastructure is prospective, which means that in the case of the appearance on the market of viable telecommunications services, it will be possible to expand the network relatively easily and quickly so that these services are included in the company’s offer as soon as possible on the designated area.

The technology of providing telecommunications services will allow the separation of individual services, such as: Internet, IP TV or VOD. Each of these services will operate within a separate virtual local area network (VLAN) and will be separated from other types of services.

An appropriate priority can be assigned to each of these virtual networks, thanks to which for each of these transmissions it will be possible to set a priority over the others, as well as assign a different bandwidth, both minimum and maximum.

Current contracts:

  1. Eliminating Territorial Differences in Terms of Access to High-Speed Broadband Internet” co-financed by the European Union from the European Regional Development Fund under the name: “Providing Access to High-Speed Broadband Internet in the Investment Area (NUTS 3): Kalisz” (area number 3.4.30.57) – Subregion 2, subregion number 3.4.30.57_2: Jarociński County, Pleszewski County and Kalisz County.

    Net value of the contract PLN 42,340,739.39
  1. Eliminating Territorial Differences in Terms of Access to High-Speed Broadband Internet” co-financed by the European Union from the European Regional Development Fund under the name: “Providing Access to High-Speed Broadband Internet in the Investment Area (NUTS 3): Koniński” (area number 3.4.30.58) – Subregion 1, subregion number 3.4.30.58_1: Koniński County and Słupecki County

    Net value of the contract PLN 39,991,354.10
  1. Eliminating Territorial Differences in Terms of Access to High-Speed Broadband Internet” co-financed by the European Union from the European Regional Development Fund under the name: “Providing Access to High-Speed Broadband Internet in the Investment Area (NUTS 3): Leszczyński” (area number 3.4.30.59) – Subregion 2, subregion number 3.4.30.59_2: Grodziski County, Wolsztyński County, Nowy Tomyśl County and Międzychodzki County.

    Net value of the contract PLN 37,469,810.85
  1. Eliminating Territorial Differences in Terms of Access to High-Speed Broadband Internet in Chełmsko-Zamojski Subregion part B3 (ID: 3.3.06.10b3)

    Net value of the contract PLN 26,119,506.65.
Total value of current broadband network projects: PLN 145,921,410.99